AISPORTS INFRA PVT LTD logo

Contact us

Let's talk about your site.

Share dimensions, location and the sport you have in mind. Our engineers respond with a layout option, specification and budget range.

Enquiry form

Send us the details.

Call instead

Submitting opens WhatsApp with your details pre-filled so you can send them in one tap.

Reach us directly

Building Grounds. Engineering Excellence.

FAQ

Frequently asked questions.

Have questions about specifications, base guidelines, curing timelines, or materials? Here are standard answers from our site engineering crew.

We strongly recommend a reinforced concrete (RCC) base slab (minimum 4-inch M25 grade with TMT rebar mesh) or a double-layered asphalt base. Subgrade compaction up to 95% Proctor density and precise laser leveling are verified before pouring to prevent settling and future surface cracking.
Standard 5-coat and 8-coat acrylic surfacing systems require 24 to 48 hours of curing time after the final coat is applied. Surfacing should only be executed during dry, sunny weather conditions to ensure proper cohesion and pigmentation.
Our premium monofilament and UV-stabilized football and cricket grass systems are designed for an 8 to 10-year active lifecycle. We back our turf installations with an official 5-year structural warranty covering fiber degradation, backing separation, and excessive wear.
Yes, we handle the entire project turnkey with our own supervised crews and machinery. This includes site surveys, earthworks excavation, base construction, perimeter chain-link GI fencing, divider nets, and photometric-designed LED floodlighting mast systems.
For outdoor box cricket and football turfs, we install a sub-surface perforated pipe network laid in a herringbone pattern within gravel drainage trenches. This system channels stormwater directly to outer masonry drains, ensuring the field is playable within 15 minutes of heavy rain.